How to maintain the horizontal directional drilling rig?

How to maintain the horizontal directional drilling rig?

Jul 11, 2022

The horizontal directional drilling rig completes a project, removes the sludge and ice slag in the mixing drum, and drains the water in the main pipe. Shift gears when the pump is stopped to avoid damaging gears and parts. Clean the gas oil pump and prevent fire and dust when filling gas oil. Pay attention to check the lubrication of all moving parts, add oil and change oil regularly in the pump body, especially after the new pump works for 500 hours, the oil must be changed once. Whether it is adding oil or changing oil, pure and impurity free lubricating oil must be selected, and the use of waste engine oil is strictly prohibited.

 

In winter, if the horizontal directional drilling rig stops the pump for a long time, the liquid in the pump and pipeline should be discharged to avoid freezing and cracking the machine parts. If the pump body and pipeline are frozen, the pump can be started only after it is removed. Pay attention to whether the pressure gauge and safety valve work normally. The working pressure of the mud pump should be strictly controlled according to the instructions of the label, and the continuous working time under the rated working pressure should not exceed one hour, and the continuous working pressure should be controlled within 80 of the rated pressure. Before each construction, check the sealing condition of each sealing part. If oil leakage and water leakage are found, repair or replace the seals immediately. Before each construction, check whether the moving parts are blocked and whether the speed change mechanism is accurate and reliable.

Three steps of horizontal directional drilling rig construction
Trenchless drilling technology has made great contributions to environmental protection