What should be paid attention to in winter horizontal directional drilling rigs?

What should be paid attention to in winter horizontal directional drilling rigs?

Oct 23, 2022

What should we do so that the horizontal directional drilling rig can work normally in the cold winter? We should do the following:

(1) Preheat the directional drilling rig in advance before using the horizontal directional drilling rig. Under normal circumstances, it is very difficult for a directional drilling rig to start at very low temperatures, or it may appear during normal directional drilling operations that the directional drilling rig suddenly fails to work and suddenly turns off. When this situation occurs again, the first thing we should do is to open the directional drilling rig in advance for preheating. Under normal circumstances, the horizontal directional drilling rig needs to be preheated for half a minute, and the opening of the directional drilling rig is carried out. The drilling rig must control the opening time. Under normal circumstances, every 5 or 6 seconds, open 3-4 times. If the directional drilling rig has not been opened, we need to wait for a few minutes. Do it again, this is for the maintenance of the directional drill.

(2) The engine of the horizontal directional drilling rig and the preheating of the hydraulic system of the directional drilling rig. When the temperature is relatively low, the directional drilling rig should not be turned on suddenly. If the directional drilling rig is turned on suddenly at this time, it will cause serious damage to the directional drilling rig. Under normal circumstances, we should warm up the directional drilling rig a few minutes in advance.

(3) When the temperature is relatively low, the maintenance of the components of the horizontal horizontal directional drilling rig that stores electricity. When the temperature gradually decreases, the capacity of the components of the directional drilling rig storage point will decrease. When this situation occurs again, we need to use cotton cloth or other items to maintain the components of the horizontal directional drilling rig storage point. We also The components of the horizontal directional drilling rig that store electricity can be disassembled and stored in a place with relatively high temperature, and the horizontal directional drilling rig can be installed when it is used.