What preparations should be made before the construction of horizontal drilling rig

What preparations should be made before the construction of horizontal drilling rig

Dec 30, 2022

1. The drilling rig, power station and construction equipment shall be arranged in a reasonable way by making full use of the existing site space.
2. Vehicles and cranes shall be used for construction machinery entering the site, usually temporarily occupying roads.
3. Temporary barricades and other facilities must be set up at the hoisting site.
4. The foundation for installing the drilling rig is solid and flat.
5. The drilling rig can be installed only after the soft foundation is reinforced. The drilling rig is installed at the incident point. After the inclination of the drilling rig is adjusted to the design incident angle, the drilling rig is fixed, connected to the power station, and connected to the pump station.