(1) The operator should understand the relevant operating conditions such as the specification of the pipeline, the condition of the quality on site, and the construction process.

(2) Operators take over shifts, start work early according to the prescribed time, observe, understand the completeness of equipment, and check things, accessories, etc. At the same time grasp the construction progress and quality status.

(3) The successor should do the cleaning work well in advance and fill in the work records. According to the requirements of the tour inspection, the accountant shall adopt the methods of listening, watching, checking and asking, and explain point by point, and both parties shall sign the account book. At the same time, engineering technicians will hand over their skills to the crew.

(4) Horizontal directional drilling rigs should be handed over under working conditions. If it is in the state of troubleshooting or maintenance, it should be explained in detail.

(5) The equipment is handed over six times and six times are not connected. Six handovers, that is, to hand over missions; hand over quality requirements and methods; hand over equipment working conditions; hand in methods; hand over the quantity and completeness of attachments; equipment work records and related materials; Do not connect if the method is unknown; do not connect if the equipment is not well maintained; do not connect if tools, accessories, and spare parts are missing or damaged; do not connect if the method is improper;