Horizontal Directional Drilling Machine Handover Notes

Horizontal Directional Drilling Machine Handover Notes

Nov 05, 2022

(1) The operator should understand the relevant operating conditions such as the specification of the pipeline, the condition of the quality on site, and the construction process.

(2) Operators take over shifts, start work early according to the prescribed time, observe, understand the completeness of equipment, and check things, accessories, etc. At the same time grasp the construction progress and quality status.

(3) The successor should do the cleaning work well in advance and fill in the work records. According to the requirements of the tour inspection, the accountant shall adopt the methods of listening, watching, checking and asking, and explain point by point, and both parties shall sign the account book. At the same time, engineering technicians will hand over their skills to the crew.

(4) The Horizontal Directional Drilling Machine should be accounted for under working conditions. If it is in the state of troubleshooting or maintenance, it should be explained in detail.

(5) The equipment is handed over six times and six times are not connected. Six handovers, that is, missions; handover quality requirements and methods; handover equipment working conditions; handover methods; quantity and completeness of handed-in accessories; equipment work records and related materials; six failures, namely: do not accept unclear missions; quality requirements Don’t connect if the method is unknown; don’t connect if the equipment is not well maintained; don’t connect if the tools, accessories, and spare parts are missing or damaged; don’t connect if the method is improper; 

 